ITAC Assessment: IA0009
ITAC logo
ITAC Assessment: IA0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 180,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,353 5,817,995
kWh
Natural Gas $68,792 24,431
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $3,612 $2,000 - $3,612
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $2,516 $250 $2,516
57,737
kWh
- -
03 2.1213: Direct warmest air to combustion intake $460 $750 - $460
-
MMBtu
-
04 2.1222: Install turbulators $424 $1,060 - $424
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $389 $810 $389
9,086
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $516 - $595
13,775
kWh
- $(-79.0)
TOTAL RECOMMENDED $7,917 $4,870 $3,500
80,598
kWh
$4,496
-
MMBtu
$(-79.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs