ITAC Assessment: UK1605
ITAC logo
ITAC Assessment: UK1605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Automotive Disc Brake Components
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 1,000
Plant Area 385,000
ft2
Annual Production 48,900,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,669,096 63,907,200
kWh
Electricity Demand $825,365 91,865
kW-mo/yr
Electricity Fees $16,575 -
Natural Gas $939,182 193,568
MMBtu
TOTAL YEARLY COSTS $5,450,218
RECOMMENDED SAVINGS* $479,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $317,014

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $101,064 $137,020 $80,805
1,407,744
kWh
$20,259
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,639 $20,491 $8,735
152,182
kWh
$1,904
-
kW-mo/yr
- -
03 2.7124: Make a practice of turning off lights when not needed $4,844 $1,774 $4,844
84,404
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,353 $4,627 $2,347
40,887
kWh
$1,006
-
kW-mo/yr
- -
05 2.4322: Use or replace with energy efficient substitutes $98,199 $221,000 $78,156
1,361,599
kWh
$20,043
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $91,413 $3,000 $75,572
1,316,587
kWh
$15,841
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $21,916 $15,000 $21,916
381,810
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $21,058 $63,000 $21,058
366,856
kWh
- - -
09 3.1161: Eliminate/reduce an operation $6,733 $1,050 $6,733
117,307
kWh
- - -
10 2.4239: Eliminate or reduce compressed air usage $241 - $241
4,205
kWh
- - -
11 2.6212: Turn off equipment during breaks, reduce operating time $7,502 $775 $7,502
130,699
kWh
- - -
12 2.2615: Clean condenser tubes $5,812 $63 $5,812
101,250
kWh
- - -
13 2.3192: Use fossil fuel powered generator during peak demand periods $26,348 $8,200 $4,133
72,000
kWh
$32,328
-
kW-mo/yr
- $(-10,113.0)
14 2.2442: Preheat combustion air with waste heat $58,000 $120,000 - - $58,000
-
MMBtu
-
15 2.1113: Reduce combustion air flow to optimum $14,200 $5,000 - - $14,200
-
MMBtu
-
16 2.2442: Preheat combustion air with waste heat $8,000 $12,000 - - $8,000
-
MMBtu
-
TOTAL RECOMMENDED $479,322 $613,000 $317,854
5,537,530
kWh
$91,381
-
kW-mo/yr
$80,200
-
MMBtu
$(-10,113.0)
TOTAL IMPLEMENTED $317,014 $388,687 $257,961
4,494,102
kWh
$59,053
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs