ITAC Assessment: IA0003
ITAC logo
ITAC Assessment: IA0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COATED RELEASE PAPER
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 40,000,000
lb
Production Hrs. Annual 8,280
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $549,351 11,840,856
kWh
Natural Gas $544,303 137,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $83,295 $210,000 $(-9,098.0)
(-196,073)
kWh
$92,393
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $1,060 $1,975 $1,060
23,154
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,902 - $7,684
165,592
kWh
$(-2,782.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $128 - $231
4,982
kWh
- $(-103.0)
05 2.6232: Install set-back timers $326 $400 $326
7,034
kWh
- -
TOTAL RECOMMENDED $89,711 $212,375 $203
4,689
kWh
$89,611
-
MMBtu
$(-103.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs