Assessment Year | 2000 |
---|---|
Principal Product | Laminated Plastic Tubes |
NAICS |
n/a
|
SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
23,000
ft2
|
Annual Production | 120,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $248,378 | 3,122,509 |
kWh
|
$0.080 |
Electricity Demand | $46,859 | 5,562 |
kW-mo/yr
|
$8.42 |
Electricity Fees | $2,231 | - |
|
- |
Natural Gas | $2,563 | 345 |
MMBtu
|
$7.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $213,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $999 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $999 | $1,969 |
$789
9,965
kWh
|
$210
-
kW-mo/yr
|
- | |
02 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $140,732 | $210,000 |
$122,248
1,536,342
kWh
|
$18,484
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,058 | $800 |
$919
11,430
kWh
|
$139
-
kW-mo/yr
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $1,147 | $7,000 |
$1,147
14,361
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,277 | $800 |
$11,277
141,852
kWh
|
- | - | |
06 | 2.4235: Remove or close off unneeded compressed air lines | $2,819 | $1,860 |
$2,819
35,463
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,603 | $15 |
$10,947
137,456
kWh
|
$1,656
-
kW-mo/yr
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,294 | $80 |
$1,294
16,413
kWh
|
- | - | |
09 | 2.3212: Optimize plant power factor | $5,459 | $6,386 | - | - | $5,459 | |
10 | 2.3511: Use plant owned transformers or lease transformers | $19,410 | $20,000 | - | - | $19,410 | |
11 | 2.8113: Purchase gas directly from a contract gas supplier | $256 | $500 | - | - | $256 | |
12 | 4.431: Train operators for maximum operating efficiency | $4,200 | - | - | - | $4,200 | |
13 | 3.7121: Improve handling practices | $2,100 | $500 | - | - | $2,100 | |
14 | 3.5215: Avoid contamination of end pieces and reuse as feed stock | $9,938 | $100 | - | - | $9,938 | |
TOTAL RECOMMENDED | $213,292 | $250,010 |
$151,440
1,903,282
kWh
|
$20,489
-
kW-mo/yr
|
$41,363 | ||
TOTAL IMPLEMENTED | $999 | $1,969 |
$789
9,965
kWh
|
$210
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs