ITAC Assessment: IA0516
ITAC logo
ITAC Assessment: IA0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Food Flavorings
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 100,000
ft2
Annual Production 16,945,700
lb
Production Hrs. Annual 8,568
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,297 3,248,055
kWh
Electricity Demand $68,596 8,561
kW-mo/yr
Electricity Fees $41,240 -
Natural Gas $229,684 40,140
MMBtu
Other Energy $219,966 37,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings
01 2.4133: Use most efficient type of electric motors $6,115 $10,277 $5,366
66,738
kWh
$749
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,099 $100 $964
11,995
kWh
$135
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,528 $2,790 $2,220
27,503
kWh
$308
-
kW-mo/yr
-
04 2.2136: Install / repair insulation on steam lines $1,151 $2,005 - - $1,151
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,297 $376 $1,136
14,137
kWh
$161
-
kW-mo/yr
-
06 2.7134: Use photocell controls $307 $1,035 $307
3,822
kWh
- -
07 2.7135: Install occupancy sensors $1,138 $1,530 $1,138
14,157
kWh
- -
TOTAL RECOMMENDED $13,635 $18,113 $11,131
138,352
kWh
$1,353
-
kW-mo/yr
$1,151
-
MMBtu
TOTAL IMPLEMENTED $11,091 $15,448 $8,722
108,378
kWh
$1,218
-
kW-mo/yr
$1,151
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs