ITAC Assessment: HO0222
ITAC logo
ITAC Assessment: HO0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 77
Plant Area 60,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,377 4,927,315
kWh
Electricity Demand $91,137 21,444
kW-mo/yr
LPG $14,635 2,797
MMBtu
Other Gas $8,650 1,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,727 $8,392 $2,338
32,532
kWh
$389
-
kW-mo/yr
- - -
02 2.4226: Use / purchase optimum sized compressor $15,554 $21,600 $15,554
184,936
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $697 $600 $697
2,931
kWh
- - - -
04 2.4224: Upgrade controls on compressors $14,666 - $14,666
174,385
kWh
- - - -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $723 $4,000 $620
8,499
kWh
$103
-
kW-mo/yr
- - -
06 2.3191: Use demand controller or load shedder $16,014 $2,700 - $16,014
-
kW-mo/yr
- - -
07 4.322: Eliminate old stock and modify inventory control $7,500 $5,000 - - - - $7,500
08 4.111: Add equipment/ operators to reduce production bottleneck $30,000 $4,000 - - - - $30,000
09 3.5221: Recycle casting sand $5,475 $500 - - - $5,475
-
lb
-
10 3.4155: Meter waste water $902 - - - $902
-
Tgal
- -
TOTAL RECOMMENDED $94,258 $46,792 $33,875
403,283
kWh
$16,506
-
kW-mo/yr
$902
-
Tgal
$5,475
-
lb
$37,500
TOTAL IMPLEMENTED $40,524 $17,492 $3,655
43,962
kWh
$492
-
kW-mo/yr
$902
-
Tgal
$5,475
-
lb
$30,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs