ITAC Assessment: HO0218
ITAC logo
ITAC Assessment: HO0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Self-Adhesive Laminates
NAICS
n/a
SIC 2754: Commercial Printing, Gravure
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 230,000
ft2
Annual Production 141,000
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $357,828 5,821,219
kWh
Electricity Demand $106,157 14,394
kW-mo/yr
Electricity Fees $582 -
Natural Gas $387,172 105,564
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,743

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,368 $41,546 $13,446
218,640
kWh
$3,922
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $2,628 $1,500 $2,128
34,584
kWh
$500
-
kW-mo/yr
- -
03 2.2515: Use optimum thickness insulation $4,499 $2,640 $4,499
359,320
kWh
- - -
04 4.652: Replace existing equipment with more suitable substitutes $1,069 - - - - $1,069
05 4.322: Eliminate old stock and modify inventory control $3,825 $5,000 - - - $3,825
06 4.652: Replace existing equipment with more suitable substitutes $5,400 $20,000 - - - $5,400
07 3.5311: Recover and reuse waste material $37,179 - - - $37,179
-
lb
-
TOTAL RECOMMENDED $71,968 $70,686 $20,073
612,544
kWh
$4,422
-
kW-mo/yr
$37,179
-
lb
$10,294
TOTAL IMPLEMENTED $62,743 $45,686 $20,073
612,544
kWh
$4,422
-
kW-mo/yr
$37,179
-
lb
$1,069
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings