| Assessment Year | 2000 |
|---|---|
| Principal Product | Self-Adhesive Laminates |
| NAICS |
n/a
|
| SIC | 2754: Commercial Printing, Gravure |
| Sales Range | $50 M to 100M |
| # of Employees | 175 |
| Plant Area |
230,000
ft2
|
| Annual Production | 141,000
thousand feet
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $357,828 | 5,821,219 |
kWh
|
$0.061 |
| Electricity Demand | $106,157 | 14,394 |
kW-mo/yr
|
$7.38 |
| Electricity Fees | $582 | - |
|
- |
| Natural Gas | $387,172 | 105,564 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $71,968 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $62,743 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,368 | $41,546 |
$13,446
218,640
kWh
|
$3,922
-
kW-mo/yr
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,628 | $1,500 |
$2,128
34,584
kWh
|
$500
-
kW-mo/yr
|
- | - | |
| 03 | 2.2515: Use optimum thickness insulation | $4,499 | $2,640 |
$4,499
359,320
kWh
|
- | - | - | |
| 04 | 4.652: Replace existing equipment with more suitable substitutes | $1,069 | - | - | - | - | $1,069 | |
| 05 | 4.322: Eliminate old stock and modify inventory control | $3,825 | $5,000 | - | - | - | $3,825 | |
| 06 | 4.652: Replace existing equipment with more suitable substitutes | $5,400 | $20,000 | - | - | - | $5,400 | |
| 07 | 3.5311: Recover and reuse waste material | $37,179 | - | - | - |
$37,179
-
lb
|
- | |
| TOTAL RECOMMENDED | $71,968 | $70,686 |
$20,073
612,544
kWh
|
$4,422
-
kW-mo/yr
|
$37,179
-
lb
|
$10,294 | ||
| TOTAL IMPLEMENTED | $62,743 | $45,686 |
$20,073
612,544
kWh
|
$4,422
-
kW-mo/yr
|
$37,179
-
lb
|
$1,069 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs