ITAC Assessment: HO0209
ITAC logo
ITAC Assessment: HO0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product High performance plastics
NAICS
n/a
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 130,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,954 4,927,902
kWh
Electricity Demand $104,083 11,209
kW-mo/yr
Electricity Fees $(-49,408.0) -
Natural Gas $37,970 6,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $44,002 $55,668 $35,541
463,658
kWh
$8,461
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $1,005 $1,600 $1,005
13,189
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,540 $570 $2,060
26,964
kWh
$480
-
kW-mo/yr
- - -
04 2.2515: Use optimum thickness insulation $24,609 $13,620 $24,609
260,258
kWh
- - - -
05 2.2511: Insulate bare equipment $3,541 $1,468 $3,541
37,515
kWh
- - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $39,910 $63,000 $55,315
720,985
kWh
$3,210
-
kW-mo/yr
$(-18,615.0)
-
MMBtu
- -
07 2.7444: Close holes and openings in building such as broken windows $3,225 $8,000 - - $3,225
-
MMBtu
- -
08 2.8113: Purchase gas directly from a contract gas supplier $3,797 $800 - - - - $3,797
09 3.4115: Recover and reuse cooling water $28,000 $70,000 - - - $28,000
-
Tgal
-
TOTAL RECOMMENDED $150,629 $214,726 $122,071
1,522,569
kWh
$12,151
-
kW-mo/yr
$(-15,390.0)
-
MMBtu
$28,000
-
Tgal
$3,797
TOTAL IMPLEMENTED $3,545 $2,170 $3,065
40,153
kWh
$480
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs