Assessment Year | 1999 |
---|---|
Principal Product | High performance plastics |
NAICS |
n/a
|
SIC | 3082: Unsupported Plastics Profile Shapes |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
130,000
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $377,954 | 4,927,902 |
kWh
|
$0.077 |
Electricity Demand | $104,083 | 11,209 |
kW-mo/yr
|
$9.29 |
Electricity Fees | $(-49,408.0) | - |
|
- |
Natural Gas | $37,970 | 6,277 |
MMBtu
|
$6.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $150,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,545 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $44,002 | $55,668 |
$35,541
463,658
kWh
|
$8,461
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $1,005 | $1,600 |
$1,005
13,189
kWh
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,540 | $570 |
$2,060
26,964
kWh
|
$480
-
kW-mo/yr
|
- | - | - | |
04 | 2.2515: Use optimum thickness insulation | $24,609 | $13,620 |
$24,609
260,258
kWh
|
- | - | - | - | |
05 | 2.2511: Insulate bare equipment | $3,541 | $1,468 |
$3,541
37,515
kWh
|
- | - | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $39,910 | $63,000 |
$55,315
720,985
kWh
|
$3,210
-
kW-mo/yr
|
$(-18,615.0)
-
MMBtu
|
- | - | |
07 | 2.7444: Close holes and openings in building such as broken windows | $3,225 | $8,000 | - | - |
$3,225
-
MMBtu
|
- | - | |
08 | 2.8113: Purchase gas directly from a contract gas supplier | $3,797 | $800 | - | - | - | - | $3,797 | |
09 | 3.4115: Recover and reuse cooling water | $28,000 | $70,000 | - | - | - |
$28,000
-
Tgal
|
- | |
TOTAL RECOMMENDED | $150,629 | $214,726 |
$122,071
1,522,569
kWh
|
$12,151
-
kW-mo/yr
|
$(-15,390.0)
-
MMBtu
|
$28,000
-
Tgal
|
$3,797 | ||
TOTAL IMPLEMENTED | $3,545 | $2,170 |
$3,065
40,153
kWh
|
$480
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs