ITAC Assessment: HO0201
ITAC logo
ITAC Assessment: HO0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Precision Turned Components
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 25,000
ft2
Annual Production 600,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,284 662,368
kWh
Electricity Demand $18,905 1,958
kW-mo/yr
Electricity Fees $5,271 -
Natural Gas $13,822 1,619
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $736 $2,782 $474
7,034
kWh
$262
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $453 $1,161 $453
6,741
kWh
- - -
03 2.7261: Install timers and/or thermostats $6,391 $1,880 $2,393
35,756
kWh
- $3,998
-
MMBtu
-
04 2.7424: Shade windows from summer sun $3,456 $6,000 $1,525
22,860
kWh
- $1,931
-
MMBtu
-
05 2.7243: Improve air circulation with destratification fans / other methods $5,652 $4,000 - - $5,652
-
MMBtu
-
06 4.611: Begin a practice of predictive / preventative maintenance $1,200 $120 - - - $1,200
07 4.424: Improve space comfort conditioning $1,000 $3,282 - - - $1,000
TOTAL RECOMMENDED $18,888 $19,225 $4,845
72,391
kWh
$262
-
kW-mo/yr
$11,581
-
MMBtu
$2,200
TOTAL IMPLEMENTED $4,456 $9,282 $1,525
22,860
kWh
- $1,931
-
MMBtu
$1,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs