ITAC Assessment: HO0199
ITAC logo
ITAC Assessment: HO0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 55,000
ft2
Annual Production 27,217,000
pieces
Production Hrs. Annual 3,162
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,021 463,365
kWh
Electricity Demand $23,184 3,006
kW-mo/yr
Electricity Fees $5,597 -
Natural Gas $15,773 1,780
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,718

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $450 $1,200 $450
5,275
kWh
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,100 - - $3,100
-
kW-mo/yr
- -
03 2.7221: Lower temperature during the winter season and vice-versa $3,627 $1,300 - - $3,627
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,503 $750 - - $2,503
-
MMBtu
-
05 4.425: Eliminate/reduce redundant inspections $2,808 $5,000 - - - $2,808
06 4.444: Install system to collect scrap $4,680 $150 - - - $4,680
07 4.111: Add equipment/ operators to reduce production bottleneck $26,520 $28,000 - - - $26,520
TOTAL RECOMMENDED $43,688 $36,400 $450
5,275
kWh
$3,100
-
kW-mo/yr
$6,130
-
MMBtu
$34,008
TOTAL IMPLEMENTED $16,718 $7,200 - $3,100
-
kW-mo/yr
$6,130
-
MMBtu
$7,488
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs