ITAC Assessment: HO0182
ITAC logo
ITAC Assessment: HO0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Windows
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 60,000
ft2
Annual Production 125,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,645 1,005,276
kWh
Electricity Demand $27,690 3,990
kW-mo/yr
Electricity Fees $(-35,550.0) -
Natural Gas $18,493 2,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,263 $4,043 $1,651
18,464
kWh
$612
-
kW-mo/yr
- - - - - -
02 2.4133: Use most efficient type of electric motors $353 $632 $353
4,103
kWh
- - - - - - -
03 2.4221: Install compressor air intakes in coolest locations $676 $1,000 - $676
-
kW-mo/yr
- - - - - -
04 2.7221: Lower temperature during the winter season and vice-versa $4,660 $6,000 - - - $4,660
-
MMBtu
- - - -
05 4.211: Consider use / purchase of bulk materials where possible $1,849 $500 - - - - - $1,849 - -
06 2.3511: Use plant owned transformers or lease transformers $8,786 $27,500 - - $8,786 - - - - -
07 4.611: Begin a practice of predictive / preventative maintenance $840 $500 - - - - $840 - - -
08 3.4116: Meter recycled water (to reduce sewer charges) $7,800 $300 - - - - $7,800 - - -
09 4.611: Begin a practice of predictive / preventative maintenance $3,000 $500 - - - - $3,000 - - -
10 3.4113: Treat and reuse rinse waters $11,066 $11,000 - - - - - - - $11,066
-
Tgal
11 3.1192: Reduce scrap production $6,989 $3,000 - - - - - - $6,989 -
TOTAL RECOMMENDED $48,282 $54,975 $2,004
22,567
kWh
$1,288
-
kW-mo/yr
$8,786 $4,660
-
MMBtu
$11,640 $1,849 $6,989 $11,066
-
Tgal
TOTAL IMPLEMENTED $37,647 $26,975 $2,004
22,567
kWh
$1,288
-
kW-mo/yr
- $4,660
-
MMBtu
$11,640 - $6,989 $11,066
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs