ITAC Assessment: HO0172
ITAC logo
ITAC Assessment: HO0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Loose leaf Binders
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area 50,000
ft2
Annual Production 1,030,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,812 308,030
kWh
Electricity Demand $19,651 1,562
kW-mo/yr
Electricity Fees $(-581.0) -
Natural Gas $17,897 2,668
MMBtu
Fuel Oil #2 $7,815 1,075
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,879 $13,312 $1,521
18,757
kWh
$1,358
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $575 $20 $297
3,810
kWh
$278
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,492 $300 $1,803
22,274
kWh
$1,689
-
kW-mo/yr
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $708 $990 - - $708
-
MMBtu
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $316 $47 - - $316
-
MMBtu
- -
06 4.652: Replace existing equipment with more suitable substitutes $3,907 $1,500 - - - $3,907
-
MMBtu
-
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $500 $2,000 - - - - $500
TOTAL RECOMMENDED $12,377 $18,169 $3,621
44,841
kWh
$3,325
-
kW-mo/yr
$1,024
-
MMBtu
$3,907
-
MMBtu
$500
TOTAL IMPLEMENTED $7,262 $13,679 $3,621
44,841
kWh
$3,325
-
kW-mo/yr
$316
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs