Assessment Year | 1998 |
---|---|
Principal Product | concrete industry products |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $50 M to 100M |
# of Employees | 103 |
Plant Area |
100,000
ft2
|
Annual Production | 24,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $301,349 | 4,272,861 |
kWh
|
$0.071 |
Electricity Demand | $44,971 | 14,368 |
kW-mo/yr
|
$3.13 |
Electricity Fees | $(-2,629.0) | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,253 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,634 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,077 | $6,192 |
$1,792
25,498
kWh
|
$285
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,676 | $4,900 |
$1,541
21,981
kWh
|
$135
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,604 | $2,236 |
$1,604
22,567
kWh
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $777 | $800 |
$714
10,258
kWh
|
$63
-
kW-mo/yr
|
- | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,956 | $6,500 | - | - |
$1,956
-
lb
|
- | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $35,663 | $10,400 |
$35,663
505,862
kWh
|
- | - | - | |
07 | 4.513: Re-arrange equipment layout to reduce labor costs | $22,500 | $14,400 | - | - | - | $22,500 | |
08 | 3.1191: Change procedures / equipment / operating conditions | $1,000 | $1,000 | - | - |
$1,000
-
lb
|
- | |
TOTAL RECOMMENDED | $67,253 | $46,428 |
$41,314
586,166
kWh
|
$483
-
kW-mo/yr
|
$2,956
-
lb
|
$22,500 | ||
TOTAL IMPLEMENTED | $29,634 | $29,528 |
$5,651
80,304
kWh
|
$483
-
kW-mo/yr
|
$1,000
-
lb
|
$22,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs