ITAC Assessment: HO0169
ITAC logo
ITAC Assessment: HO0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product concrete industry products
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 103
Plant Area 100,000
ft2
Annual Production 24,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,349 4,272,861
kWh
Electricity Demand $44,971 14,368
kW-mo/yr
Electricity Fees $(-2,629.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,077 $6,192 $1,792
25,498
kWh
$285
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,676 $4,900 $1,541
21,981
kWh
$135
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $1,604 $2,236 $1,604
22,567
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $777 $800 $714
10,258
kWh
$63
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,956 $6,500 - - $1,956
-
lb
-
06 2.7243: Improve air circulation with destratification fans / other methods $35,663 $10,400 $35,663
505,862
kWh
- - -
07 4.513: Re-arrange equipment layout to reduce labor costs $22,500 $14,400 - - - $22,500
08 3.1191: Change procedures / equipment / operating conditions $1,000 $1,000 - - $1,000
-
lb
-
TOTAL RECOMMENDED $67,253 $46,428 $41,314
586,166
kWh
$483
-
kW-mo/yr
$2,956
-
lb
$22,500
TOTAL IMPLEMENTED $29,634 $29,528 $5,651
80,304
kWh
$483
-
kW-mo/yr
$1,000
-
lb
$22,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs