ITAC Assessment: HO0165
ITAC logo
ITAC Assessment: HO0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Medical and food packaging
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 18,000
ft2
Annual Production 36,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,646 536,635
kWh
Electricity Demand $22,040 2,455
kW-mo/yr
Electricity Fees $(-2,762.0) -
Natural Gas $6,010 603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,288 $8,266 $1,426
16,413
kWh
$862
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $171 $510 $171
2,052
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $949 $800 $595
6,741
kWh
$354
-
kW-mo/yr
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,280 $6,500 - - $5,400
-
lb
$(-3,120.0)
05 4.652: Replace existing equipment with more suitable substitutes $3,900 $1,920 - - - $3,900
TOTAL RECOMMENDED $9,588 $17,996 $2,192
25,206
kWh
$1,216
-
kW-mo/yr
$5,400
-
lb
$780
TOTAL IMPLEMENTED $2,459 $8,776 $1,597
18,465
kWh
$862
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs