ITAC Assessment: HO0162
ITAC logo
ITAC Assessment: HO0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Retail Plastic Bags
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 15,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,464 1,743,552
kWh
Electricity Demand $75,222 3,242
kW-mo/yr
Electricity Fees $18,783 -
Natural Gas $24,293 2,325
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,888 $9,937 $4,104
72,978
kWh
$2,784
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $843 $947 $843
14,654
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,465 $800 $932
16,120
kWh
$533
-
kW-mo/yr
- -
04 2.8112: Combine utility meters $3,758 $3,000 - $3,758
-
kW-mo/yr
- -
05 4.441: Install automatic packing equipment $10,937 $5,500 - - $10,937 -
06 3.1111: Cover ink containers when not in use $337 - - - - $337
TOTAL RECOMMENDED $24,228 $20,184 $5,879
103,752
kWh
$7,075
-
kW-mo/yr
$10,937 $337
TOTAL IMPLEMENTED $8,690 $10,737 $5,036
89,098
kWh
$3,317
-
kW-mo/yr
- $337
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs