| Assessment Year | 1997 |
|---|---|
| Principal Product | Extruding plastics |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 60 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $85,187 | 1,497,069 |
kWh
|
$0.057 |
| Electricity Demand | $97,692 | 4,320 |
kW-mo/yr
|
$22.61 |
| Electricity Fees | $15,249 | - |
|
- |
| Natural Gas | $2,438 | 314 |
MMBtu
|
$7.76 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,465 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,948 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,562 | $13,794 |
$5,330
93,787
kWh
|
$4,232
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $655 | $1,350 |
$655
11,430
kWh
|
- | - | - | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,827 | - |
$5,243
92,028
kWh
|
$4,084
-
kW-mo/yr
|
- | $(-4,500.0) | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $621 | $600 |
$351
6,155
kWh
|
$270
-
kW-mo/yr
|
- | - | - | |
| 05 | 4.431: Train operators for maximum operating efficiency | $2,500 | $1,000 | - | - | - | $2,500 | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,300 | $6,500 | - | - |
$6,300
-
lb
|
$(-3,000.0) | - | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $2,000 | $2,000 | - | - | - | $(-2,000.0) | $4,000 | |
| TOTAL RECOMMENDED | $23,465 | $25,244 |
$11,579
203,400
kWh
|
$8,586
-
kW-mo/yr
|
$6,300
-
lb
|
$(-7,000.0) | $4,000 | ||
| TOTAL IMPLEMENTED | $7,948 | $1,600 |
$5,594
98,183
kWh
|
$4,354
-
kW-mo/yr
|
- | $(-2,000.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs