ITAC Assessment: HO0158
ITAC logo
ITAC Assessment: HO0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Extruding plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 50,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,187 1,497,069
kWh
Electricity Demand $97,692 4,320
kW-mo/yr
Electricity Fees $15,249 -
Natural Gas $2,438 314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,948

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,562 $13,794 $5,330
93,787
kWh
$4,232
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $655 $1,350 $655
11,430
kWh
- - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,827 - $5,243
92,028
kWh
$4,084
-
kW-mo/yr
- $(-4,500.0) -
04 2.4221: Install compressor air intakes in coolest locations $621 $600 $351
6,155
kWh
$270
-
kW-mo/yr
- - -
05 4.431: Train operators for maximum operating efficiency $2,500 $1,000 - - - $2,500 -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,300 $6,500 - - $6,300
-
lb
$(-3,000.0) -
07 3.1191: Change procedures / equipment / operating conditions $2,000 $2,000 - - - $(-2,000.0) $4,000
TOTAL RECOMMENDED $23,465 $25,244 $11,579
203,400
kWh
$8,586
-
kW-mo/yr
$6,300
-
lb
$(-7,000.0) $4,000
TOTAL IMPLEMENTED $7,948 $1,600 $5,594
98,183
kWh
$4,354
-
kW-mo/yr
- $(-2,000.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs