ITAC Assessment: SU0539
ITAC logo
ITAC Assessment: SU0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Gas and Leak Detection Equipment
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range less than $500
k
# of Employees 320
Plant Area 204,000
ft2
Annual Production 500
units
Production Hrs. Annual 3,060
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $461,966 6,136,728
kWh
Electricity Demand $125,605 10,804
kW-mo/yr
Natural Gas $13,308 7,376
MMBtu
TOTAL YEARLY COSTS $600,880
RECOMMENDED SAVINGS* $31,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $1,626 - $1,010
13,415
kWh
$616
-
kW-mo/yr
- -
02 2.7314: Reduce ventilation air $10,262 $5,600 $5,720
75,969
kWh
- $4,542
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,866 $1,925 $2,866
38,060
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,490 $11,867 $10,187
135,283
kWh
$6,170
-
kW-mo/yr
- $133
TOTAL RECOMMENDED $31,244 $19,392 $19,783
262,727
kWh
$6,786
-
kW-mo/yr
$4,542
-
MMBtu
$133
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs