Assessment Year | 1997 |
---|---|
Principal Product | Pharmaceutical products |
NAICS |
n/a
|
SIC | 2833: Medicinal Chemicals and Botanical Products |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
246,000
ft2
|
Annual Production | 9,624,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $256,057 | 3,095,545 |
kWh
|
$0.083 |
Electricity Demand | $63,620 | 7,575 |
kW-mo/yr
|
$8.40 |
Electricity Fees | $(-36,608.0) | - |
|
- |
Natural Gas | $64,617 | 14,929 |
MMBtu
|
$4.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $117,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,989 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,962 | $81,329 |
$28,511
343,200
kWh
|
$6,451
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,732 | $300 |
$2,287
27,550
kWh
|
$445
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7131: Add area lighting switches | $1,213 | $350 |
$1,213
14,654
kWh
|
- | - | - | - | - | |
04 | 2.7135: Install occupancy sensors | $12,745 | $1,800 |
$12,745
153,576
kWh
|
- | - | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,419 | $1,000 |
$3,699
44,549
kWh
|
$720
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $10,486 | $11,610 | - | - |
$10,486
-
MMBtu
|
- | - | - | |
07 | 4.441: Install automatic packing equipment | $5,850 | $20,000 | - | - | - | - | $5,850 | - | |
08 | 4.432: Cross-train personnel to avoid lost time | $8,640 | $500 | - | - | - | - | $8,640 | - | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $4,716 | $10,000 | - | - | - | - | - | $4,716 | |
10 | 3.3127: Use adsorption, ion exchange to remove contaminants | $31,248 | $20,000 | - | - | - |
$31,248
-
gal
|
- | - | |
TOTAL RECOMMENDED | $117,011 | $146,889 |
$48,455
583,529
kWh
|
$7,616
-
kW-mo/yr
|
$10,486
-
MMBtu
|
$31,248
-
gal
|
$14,490 | $4,716 | ||
TOTAL IMPLEMENTED | $77,989 | $131,679 |
$29,724
357,854
kWh
|
$6,451
-
kW-mo/yr
|
- |
$31,248
-
gal
|
$5,850 | $4,716 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs