ITAC Assessment: HO0154
ITAC logo
ITAC Assessment: HO0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Guitars
NAICS
n/a
SIC 3931: Musical Instruments
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 18,000
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,481 3,076,788
kWh
Electricity Demand $91,499 9,581
kW-mo/yr
Electricity Fees $3,755 -
Natural Gas $142,191 20,868
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $147,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,507

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,944 $21,668 $3,881
93,787
kWh
$2,063
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $178 $575 $178
4,396
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $6,425 $3,182 - - $6,425
-
MMBtu
- -
04 4.513: Re-arrange equipment layout to reduce labor costs $15,600 $10,800 - - - - $15,600
05 4.111: Add equipment/ operators to reduce production bottleneck $117,000 $525,000 - - - - $117,000
06 3.3131: Use evaporation to concentrate material $2,563 $10,000 - - $(-363.0)
-
MMBtu
$2,926
-
gal
-
TOTAL RECOMMENDED $147,710 $571,225 $4,059
98,183
kWh
$2,063
-
kW-mo/yr
$6,062
-
MMBtu
$2,926
-
gal
$132,600
TOTAL IMPLEMENTED $8,507 $31,668 $3,881
93,787
kWh
$2,063
-
kW-mo/yr
$(-363.0)
-
MMBtu
$2,926
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs