| Assessment Year | 1997 |
|---|---|
| Principal Product | Guitars |
| NAICS |
n/a
|
| SIC | 3931: Musical Instruments |
| Sales Range | $10 M to 50M |
| # of Employees | 400 |
| Plant Area |
18,000
ft2
|
| Annual Production | 24,000
pieces
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $127,481 | 3,076,788 |
kWh
|
$0.041 |
| Electricity Demand | $91,499 | 9,581 |
kW-mo/yr
|
$9.55 |
| Electricity Fees | $3,755 | - |
|
- |
| Natural Gas | $142,191 | 20,868 |
MMBtu
|
$6.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $147,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,507 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,944 | $21,668 |
$3,881
93,787
kWh
|
$2,063
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $178 | $575 |
$178
4,396
kWh
|
- | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $6,425 | $3,182 | - | - |
$6,425
-
MMBtu
|
- | - | |
| 04 | 4.513: Re-arrange equipment layout to reduce labor costs | $15,600 | $10,800 | - | - | - | - | $15,600 | |
| 05 | 4.111: Add equipment/ operators to reduce production bottleneck | $117,000 | $525,000 | - | - | - | - | $117,000 | |
| 06 | 3.3131: Use evaporation to concentrate material | $2,563 | $10,000 | - | - |
$(-363.0)
-
MMBtu
|
$2,926
-
gal
|
- | |
| TOTAL RECOMMENDED | $147,710 | $571,225 |
$4,059
98,183
kWh
|
$2,063
-
kW-mo/yr
|
$6,062
-
MMBtu
|
$2,926
-
gal
|
$132,600 | ||
| TOTAL IMPLEMENTED | $8,507 | $31,668 |
$3,881
93,787
kWh
|
$2,063
-
kW-mo/yr
|
$(-363.0)
-
MMBtu
|
$2,926
-
gal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs