ITAC Assessment: HO0153
ITAC logo
ITAC Assessment: HO0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Cable Shielding
NAICS
n/a
SIC 3481:
Sales Range $10
M
to 50
M
# of Employees 249
Plant Area 49,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,550
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,659 1,934,056
kWh
Electricity Demand $41,153 5,728
kW-mo/yr
Electricity Fees $4,045 -
Natural Gas $43,840 7,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $820 $716 $820
9,379
kWh
- - - - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,194 $3,500 - $10,194
-
kW-mo/yr
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $913 $800 $750
8,499
kWh
$163
-
kW-mo/yr
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $745 $80 $684
7,034
kWh
$61
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $398 $450 $358
4,103
kWh
$40
-
kW-mo/yr
- - - - -
06 2.4323: Use optimum size and capacity equipment $2,671 $8,775 $2,194
25,205
kWh
$477
-
kW-mo/yr
- - - - -
07 2.2414: Use waste heat from hot flue gases to preheat $2,949 $1,563 - - $2,949
-
MMBtu
- - - -
08 4.211: Consider use / purchase of bulk materials where possible $4,384 $500 - - - - - $4,384 -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,962 $6,500 - - - - $10,962
-
lb
- -
10 3.4151: Minimize water usage $5,074 $500 - - - - - - $5,074
-
Tgal
11 3.3131: Use evaporation to concentrate material $4,738 $10,000 - - $(-62.0)
-
MMBtu
$4,800
-
gal
- - -
TOTAL RECOMMENDED $43,848 $33,384 $4,806
54,220
kWh
$10,935
-
kW-mo/yr
$2,887
-
MMBtu
$4,800
-
gal
$10,962
-
lb
$4,384 $5,074
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs