Assessment Year | 1997 |
---|---|
Principal Product | Cable Shielding |
NAICS |
n/a
|
SIC | 3481: |
Sales Range | $10 M to 50M |
# of Employees | 249 |
Plant Area |
49,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $168,659 | 1,934,056 |
kWh
|
$0.087 |
Electricity Demand | $41,153 | 5,728 |
kW-mo/yr
|
$7.18 |
Electricity Fees | $4,045 | - |
|
- |
Natural Gas | $43,840 | 7,109 |
MMBtu
|
$6.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $820 | $716 |
$820
9,379
kWh
|
- | - | - | - | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $10,194 | $3,500 | - |
$10,194
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $913 | $800 |
$750
8,499
kWh
|
$163
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $745 | $80 |
$684
7,034
kWh
|
$61
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $398 | $450 |
$358
4,103
kWh
|
$40
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.4323: Use optimum size and capacity equipment | $2,671 | $8,775 |
$2,194
25,205
kWh
|
$477
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $2,949 | $1,563 | - | - |
$2,949
-
MMBtu
|
- | - | - | - | |
08 | 4.211: Consider use / purchase of bulk materials where possible | $4,384 | $500 | - | - | - | - | - | $4,384 | - | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,962 | $6,500 | - | - | - | - |
$10,962
-
lb
|
- | - | |
10 | 3.4151: Minimize water usage | $5,074 | $500 | - | - | - | - | - | - |
$5,074
-
Tgal
|
|
11 | 3.3131: Use evaporation to concentrate material | $4,738 | $10,000 | - | - |
$(-62.0)
-
MMBtu
|
$4,800
-
gal
|
- | - | - | |
TOTAL RECOMMENDED | $43,848 | $33,384 |
$4,806
54,220
kWh
|
$10,935
-
kW-mo/yr
|
$2,887
-
MMBtu
|
$4,800
-
gal
|
$10,962
-
lb
|
$4,384 |
$5,074
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs