Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed Cicuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $1
M
to 5
M
# of Employees 51
Plant Area 10,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 5,096
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,405 668,816
kWh
Electricity Demand $21,404 2,523
kW-mo/yr
Electricity Fees $14,372 -
Natural Gas $2,109 231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,638 $5,469 $2,991
33,118
kWh
$647
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $241 $245 $241
2,638
kWh
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $482 $400 $397
4,396
kWh
$85
-
kW-mo/yr
- - - -
04 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $2,241 $6,000 $1,985
21,981
kWh
$256
-
kW-mo/yr
- - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,832 $10,000 $1,605
17,878
kWh
$1,780
-
kW-mo/yr
$(-553.0)
-
MMBtu
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,500 $6,500 - - - - $6,500
-
lb
-
07 3.7141: Improve cleaning efficiency by maintaining cleaning system $32,500 $6,000 - - - - $52,500
-
lb
$(-20,000.0)
-
Tgal
08 3.3131: Use evaporation to concentrate material $3,963 $1,500 - - $(-237.0)
-
MMBtu
$4,200
-
gal
- -
TOTAL RECOMMENDED $52,397 $36,114 $7,219
80,011
kWh
$2,768
-
kW-mo/yr
$(-790.0)
-
MMBtu
$4,200
-
gal
$59,000
-
lb
$(-20,000.0)
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs