ITAC Assessment: SD0347
ITAC logo
ITAC Assessment: SD0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product plastics bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 67,000
ft2
Annual Production 30,000,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $819,390 8,783,308
kWh
Electricity Demand $169,226 13,624
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $163,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,463

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,911 $450 $6,688
71,690
kWh
$1,223
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $5,552 - $5,552
59,508
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,721 $21,387 $12,448
133,416
kWh
$2,273
-
kW-mo/yr
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,700 $18,500 - - $7,700
-
lb
-
05 4.441: Install automatic packing equipment $128,000 $145,000 - - - $128,000
TOTAL RECOMMENDED $163,884 $185,337 $24,688
264,614
kWh
$3,496
-
kW-mo/yr
$7,700
-
lb
$128,000
TOTAL IMPLEMENTED $13,463 $450 $12,240
131,198
kWh
$1,223
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs