ITAC Assessment: HO0150
ITAC logo
ITAC Assessment: HO0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Expanding File Folders
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 68,000
ft2
Annual Production 2,080,000
lb
Production Hrs. Annual 2,132
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,674 690,504
kWh
Electricity Demand $105,435 3,653
kW-mo/yr
Electricity Fees $7,665 -
Natural Gas $7,134 875
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,148 $31,658 $3,448
57,151
kWh
$9,700
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $791 $700 $214
3,517
kWh
$577
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $413 $310 $246
4,103
kWh
$167
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,566 $60 $1,204
19,930
kWh
$3,362
-
kW-mo/yr
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,000 $6,500 - - - - $9,000
-
lb
06 2.7423: Reduce heat gain by window tinting $5,161 $7,590 $4,520
75,029
kWh
$641
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,238 $20,020 $2,285
37,515
kWh
$3,953
-
kW-mo/yr
- - -
08 2.7231: Use radiant heater for spot heating $956 $3,000 - - $956
-
MMBtu
- -
09 3.4151: Minimize water usage $390 $100 - - - $390
-
Tgal
-
TOTAL RECOMMENDED $40,663 $69,938 $11,917
197,245
kWh
$18,400
-
kW-mo/yr
$956
-
MMBtu
$390
-
Tgal
$9,000
-
lb
TOTAL IMPLEMENTED $2,550 $4,110 $460
7,620
kWh
$744
-
kW-mo/yr
$956
-
MMBtu
$390
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings