Assessment Year | 1997 |
---|---|
Principal Product | Vibration control products |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
80,000
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,155 | 908,558 |
kWh
|
$0.090 |
Electricity Demand | $55,744 | 4,855 |
kW-mo/yr
|
$11.48 |
Electricity Fees | $9,912 | - |
|
- |
Natural Gas | $74,250 | 8,937 |
MMBtu
|
$8.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,332 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $661 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,073 | $6,276 |
$1,246
13,775
kWh
|
$827
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $327 | $1,433 |
$327
3,517
kWh
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $661 | $500 |
$392
4,396
kWh
|
$269
-
kW-mo/yr
|
- | - | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $9,805 | $17,760 | - | - |
$9,805
-
MMBtu
|
- | - | |
05 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $1,170 | $500 | - | - | - |
$1,170
-
gal
|
- | |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $10,296 | $10,000 | - | - | - | - | $10,296 | |
TOTAL RECOMMENDED | $24,332 | $36,469 |
$1,965
21,688
kWh
|
$1,096
-
kW-mo/yr
|
$9,805
-
MMBtu
|
$1,170
-
gal
|
$10,296 | ||
TOTAL IMPLEMENTED | $661 | $500 |
$392
4,396
kWh
|
$269
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs