ITAC Assessment: HO0145
ITAC logo
ITAC Assessment: HO0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Vibration control products
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 80,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,155 908,558
kWh
Electricity Demand $55,744 4,855
kW-mo/yr
Electricity Fees $9,912 -
Natural Gas $74,250 8,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,073 $6,276 $1,246
13,775
kWh
$827
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $327 $1,433 $327
3,517
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $661 $500 $392
4,396
kWh
$269
-
kW-mo/yr
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $9,805 $17,760 - - $9,805
-
MMBtu
- -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,170 $500 - - - $1,170
-
gal
-
06 4.513: Re-arrange equipment layout to reduce labor costs $10,296 $10,000 - - - - $10,296
TOTAL RECOMMENDED $24,332 $36,469 $1,965
21,688
kWh
$1,096
-
kW-mo/yr
$9,805
-
MMBtu
$1,170
-
gal
$10,296
TOTAL IMPLEMENTED $661 $500 $392
4,396
kWh
$269
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs