| Assessment Year | 1996 |
|---|---|
| Principal Product | Heat Treaters |
| NAICS |
n/a
|
| SIC | 3398: Metal Heat Treating |
| Sales Range | $1 M to 5M |
| # of Employees | 24 |
| Plant Area |
20,000
ft2
|
| Annual Production | 3,900,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,757 | 1,003,224 |
kWh
|
$0.068 |
| Electricity Demand | $24,973 | 2,786 |
kW-mo/yr
|
$8.96 |
| Natural Gas | $138,016 | 29,051 |
MMBtu
|
$4.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,417 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,587 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $598 | $1,530 |
$408
5,569
kWh
|
$190
-
kW-mo/yr
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $300 | $343 |
$300
4,103
kWh
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $399 | $400 |
$322
4,396
kWh
|
$77
-
kW-mo/yr
|
- | - | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $4,870 | $1,129 | - | - |
$4,870
-
MMBtu
|
- | |
| 05 | 2.2211: Use optimum temperature | $2,290 | $3,000 | - | - |
$2,290
-
MMBtu
|
- | |
| 06 | 3.1191: Change procedures / equipment / operating conditions | $960 | $1,000 | - | - | - |
$960
-
gal
|
|
| TOTAL RECOMMENDED | $9,417 | $7,402 |
$1,030
14,068
kWh
|
$267
-
kW-mo/yr
|
$7,160
-
MMBtu
|
$960
-
gal
|
||
| TOTAL IMPLEMENTED | $3,587 | $5,273 |
$1,030
14,068
kWh
|
$267
-
kW-mo/yr
|
$2,290
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs