ITAC Assessment: HO0139
ITAC logo
ITAC Assessment: HO0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Heat Treaters
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area 20,000
ft2
Annual Production 3,900,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,757 1,003,224
kWh
Electricity Demand $24,973 2,786
kW-mo/yr
Natural Gas $138,016 29,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,587

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $598 $1,530 $408
5,569
kWh
$190
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $300 $343 $300
4,103
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $399 $400 $322
4,396
kWh
$77
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $4,870 $1,129 - - $4,870
-
MMBtu
-
05 2.2211: Use optimum temperature $2,290 $3,000 - - $2,290
-
MMBtu
-
06 3.1191: Change procedures / equipment / operating conditions $960 $1,000 - - - $960
-
gal
TOTAL RECOMMENDED $9,417 $7,402 $1,030
14,068
kWh
$267
-
kW-mo/yr
$7,160
-
MMBtu
$960
-
gal
TOTAL IMPLEMENTED $3,587 $5,273 $1,030
14,068
kWh
$267
-
kW-mo/yr
$2,290
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs