ITAC Assessment: AS0195
ITAC logo
ITAC Assessment: AS0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Antenna Systems and Related Equipment
NAICS
n/a
SIC 3662:
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 170,000
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 2,525
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,997 2,702,227
kWh
Electricity Demand $19,678 10,174
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,354

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.7232: Replace existing hvac unit with high efficiency model $13,771 $38,500 $12,422
234,760
kWh
$1,349
-
kW-mo/yr
-
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $6,617 $13,200 $6,617
121,336
kWh
- -
03 2.7135: Install occupancy sensors $872 $975 $872
16,413
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,057 $1,120 $926
17,585
kWh
$131
-
kW-mo/yr
-
05 2.7124: Make a practice of turning off lights when not needed $2,337 - $2,047
38,687
kWh
$290
-
kW-mo/yr
-
06 2.7124: Make a practice of turning off lights when not needed $12,177 - $10,665
201,641
kWh
$1,512
-
kW-mo/yr
-
07 2.7124: Make a practice of turning off lights when not needed $4,031 - $3,530
66,823
kWh
$501
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $218 - $218
4,396
kWh
- -
09 2.7314: Reduce ventilation air $263 $100 $263
4,982
kWh
- -
10 3.5316: Contract a wood pallet recycling company $900 - - - $900
11 4.511: Expand operations into unused space $67,684 $10,000 - - $67,684
TOTAL RECOMMENDED $109,927 $63,895 $37,560
706,623
kWh
$3,783
-
kW-mo/yr
$68,584
TOTAL IMPLEMENTED $27,354 $15,395 $24,920
467,467
kWh
$2,434
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs