ITAC Assessment: HO0136
ITAC logo
ITAC Assessment: HO0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Polyester Fiber Fill
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 24,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,114 240,328
kWh
Electricity Demand $43,055 1,906
kW-mo/yr
Electricity Fees $3,037 -
Natural Gas $45,240 5,445
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $325 $1,302 $103
1,758
kWh
$222
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $211 $905 $211
3,517
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $96 $200 $96
1,465
kWh
- - -
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $47,059 $145,000 $12,191
206,624
kWh
$39,306
-
kW-mo/yr
$(-4,438.0)
-
MMBtu
-
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,736 $6,500 - - - $5,736
-
lb
TOTAL RECOMMENDED $53,427 $153,907 $12,601
213,364
kWh
$39,528
-
kW-mo/yr
$(-4,438.0)
-
MMBtu
$5,736
-
lb
TOTAL IMPLEMENTED $53,102 $152,605 $12,498
211,606
kWh
$39,306
-
kW-mo/yr
$(-4,438.0)
-
MMBtu
$5,736
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs