ITAC Assessment: MZ0317
ITAC logo
ITAC Assessment: MZ0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fresh and frozen ground chicken for pet food
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 140,000
ft2
Annual Production 158,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,181,540 16,422,047
kWh
Electricity Demand $373,202 32,632
kW-mo/yr
Natural Gas $28,534 4,111
MMBtu
Waste Disposal Costs
Water Usage $199,123 21,855
Tgal
TOTAL YEARLY COSTS $1,782,399
RECOMMENDED SAVINGS* $63,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,245

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,392 $12,626 $3,920
54,450
kWh
$1,198
-
kW-mo/yr
$1,274
02 2.7135: Install occupancy sensors $607 $800 $607
7,682
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,246 $4,000 $2,246
31,200
kWh
- -
04 2.9114: Use solar heat to make electricty $50,287 $477,500 $50,287
698,430
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,898 - $2,933
40,740
kWh
$965
-
kW-mo/yr
-
TOTAL RECOMMENDED $63,430 $494,926 $59,993
832,502
kWh
$2,163
-
kW-mo/yr
$1,274
TOTAL IMPLEMENTED $9,245 $17,426 $6,773
93,332
kWh
$1,198
-
kW-mo/yr
$1,274
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs