ITAC Assessment: HO0127
ITAC logo
ITAC Assessment: HO0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electrical Controls
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $5
M
to 10
M
# of Employees 54
Plant Area 30,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,025 590,563
kWh
Electricity Demand $33,006 1,704
kW-mo/yr
Electricity Fees $6,115 -
Natural Gas $19,828 2,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $167 $40 $167
1,465
kWh
- -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $5,231 $657 $1,715
14,361
kWh
- $3,516
-
MMBtu
03 2.4133: Use most efficient type of electric motors $317 $400 $154
2,931
kWh
$163
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $477 $400 $231
4,396
kWh
$246
-
kW-mo/yr
-
TOTAL RECOMMENDED $6,192 $1,497 $2,267
23,153
kWh
$409
-
kW-mo/yr
$3,516
-
MMBtu
TOTAL IMPLEMENTED $5,715 $1,097 $2,036
18,757
kWh
$163
-
kW-mo/yr
$3,516
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs