ITAC Assessment: UD0195
ITAC logo
ITAC Assessment: UD0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product BAKERY PRODUCTS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,525
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,494 741,208
kWh
Natural Gas $26,294 5,035
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,169

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1393: Use steam sparging or injections in place of indirect heating $10,751 - $(-1,261.0)
(-11,430)
kWh
$3,372
-
MMBtu
$8,640
02 2.4322: Use or replace with energy efficient substitutes $418 - - $418
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $312 $58 $312
8,206
kWh
- -
TOTAL RECOMMENDED $11,481 $58 $(-949.0)
(-3,224)
kWh
$3,790
-
MMBtu
$8,640
TOTAL IMPLEMENTED $11,169 - $(-1,261.0)
(-11,430)
kWh
$3,790
-
MMBtu
$8,640
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs