ITAC Assessment: WV0023
ITAC logo
ITAC Assessment: WV0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Engine Bearings
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $50
M
to 100
M
# of Employees 545
Plant Area 225,000
ft2
Annual Production 85,000,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $924,746 24,960,141
kWh
Natural Gas $201,962 36,499
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,806 $15,603 $2,806
47,773
kWh
-
02 2.4133: Use most efficient type of electric motors $1,312 $29,510 $1,312
7,620
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $6,240 $452 $6,240
176,143
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,526 $1,000 - $1,526
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $325 $116 - $325
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,432 - $4,432
125,147
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,359 $200 $3,359
94,959
kWh
-
TOTAL RECOMMENDED $20,000 $46,881 $18,149
451,642
kWh
$1,851
-
MMBtu
TOTAL IMPLEMENTED $11,909 $45,313 $11,909
275,499
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs