ITAC Assessment: HO0126
ITAC logo
ITAC Assessment: HO0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive Accessories
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 90,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,797 412,954
kWh
Electricity Fees $4,697 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,672 $2,866 $5,672
19,343
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,280 $6,484 $6,280
21,395
kWh
-
03 2.4133: Use most efficient type of electric motors $2,975 $3,110 $2,975
10,258
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,573 $400 $1,573
5,275
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,352 $180 $3,352
11,430
kWh
-
06 3.6192: Use a less expensive method of waste removal $5,430 - - $5,430
-
lb
TOTAL RECOMMENDED $25,282 $13,040 $19,852
67,701
kWh
$5,430
-
lb
TOTAL IMPLEMENTED $19,852 $13,040 $19,852
67,701
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs