Assessment Year | 2011 |
---|---|
Principal Product | Epoxidized Soybean Oil |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
33,574
ft2
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $361,870 | 5,222,597 |
kWh
|
$0.069 |
Electricity Demand | $62,696 | 8,961 |
kW-mo/yr
|
$7.00 |
Electricity Fees | $6,028 | - |
|
- |
Natural Gas | $367,682 | 75,670 |
MMBtu
|
$4.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,790 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,055 | $500 |
$4,429
63,917
kWh
|
$626
-
kW-mo/yr
|
- | |
02 | 2.7134: Use photocell controls | $361 | $235 |
$361
5,212
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,748 | $3,095 |
$1,390
20,062
kWh
|
$358
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $907 | $760 |
$907
11,328
kWh
|
- | - | |
05 | 2.2135: Repair and eliminate steam leaks | $4,181 | $3,000 | - | - |
$4,181
-
MMBtu
|
|
06 | 2.7224: Reduce space conditioning during non-working hours | $1,257 | $50 | - | - |
$1,257
-
MMBtu
|
|
07 | 2.7111: Reduce illumination to minimum necessary levels | $281 | $754 |
$281
4,048
kWh
|
- | - | |
TOTAL RECOMMENDED | $13,790 | $8,394 |
$7,368
104,567
kWh
|
$984
-
kW-mo/yr
|
$5,438
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs