ITAC Assessment: HO0120
ITAC logo
ITAC Assessment: HO0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Epoxies
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 20,000
ft2
Annual Production 3,000
Tgal
Production Hrs. Annual 4,732
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,780 172,333
kWh
Fuel Oil #2 $7,177 906
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,052 $4,538 $3,052
16,706
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $401 $286 $401
2,052
kWh
-
03 2.4133: Use most efficient type of electric motors $89 $60 $89
586
kWh
-
04 2.2136: Install / repair insulation on steam lines $81 $30 - $81
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $604 $400 $604
3,224
kWh
-
TOTAL RECOMMENDED $4,227 $5,314 $4,146
22,568
kWh
$81
-
MMBtu
TOTAL IMPLEMENTED $4,227 $5,314 $4,146
22,568
kWh
$81
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs