ITAC Assessment: HO0113
ITAC logo
ITAC Assessment: HO0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Jewelry Boxes
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 58,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 2,480
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,015 203,400
kWh
Natural Gas $3,586 469
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,495 $1,900 $3,495
15,240
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $682 $854 $682
2,931
kWh
03 2.4133: Use most efficient type of electric motors $159 $142 $159
586
kWh
04 2.4221: Install compressor air intakes in coolest locations $755 $900 $755
3,224
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,427 $300 $4,427
19,050
kWh
06 2.4235: Remove or close off unneeded compressed air lines $1,623 $50 $1,623
6,741
kWh
07 2.7135: Install occupancy sensors $862 $400 $862
3,810
kWh
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $211 $60 $211
879
kWh
TOTAL RECOMMENDED $12,214 $4,606 $12,214
52,461
kWh
TOTAL IMPLEMENTED $9,359 $3,954 $9,359
40,445
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs