ITAC Assessment: HO0112
ITAC logo
ITAC Assessment: HO0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 185,000
ft2
Annual Production 230,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $590,277 7,664,713
kWh
Natural Gas $50,043 5,399
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,188

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings
01 2.7144: Install spectral reflectors / delamp $4,084 - $4,084
53,048
kWh
-
02 2.7135: Install occupancy sensors $566 $250 $566
7,327
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $502 - $502
6,448
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,162 $300 $2,162
28,136
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $240 $160 $240
3,224
kWh
-
06 3.6192: Use a less expensive method of waste removal $3,942 $500 - $3,942
-
gal
TOTAL RECOMMENDED $11,496 $1,210 $7,554
98,183
kWh
$3,942
-
gal
TOTAL IMPLEMENTED $10,188 $800 $6,246
81,184
kWh
$3,942
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs