ITAC Assessment: HO0104
ITAC logo
ITAC Assessment: HO0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Toilet Partitions
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $5
M
to 10
M
# of Employees 92
Plant Area 60,000
ft2
Annual Production 132,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,949 499,707
kWh
Natural Gas $73,915 9,189
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,552 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,127 $3,978 n/a $2,127
32,239
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $419 $1,555 n/a $419
6,448
kWh
- -
03 2.4133: Use most efficient type of electric motors $97 $412 n/a $97
1,465
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $447 $600 n/a $447
5,862
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $175 $390 n/a $175
2,638
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,910 $300 n/a $1,910
29,015
kWh
- -
07 2.8114: Change rate schedules or other changes in utility service $31,627 $50,000 n/a - - $31,627
08 2.2614: Use cooling tower or economizer to replace chiller cooling $750 $2,500 n/a $(-46.0)
(-586)
kWh
$796
-
Tgal
-
TOTAL RECOMMENDED $37,552 $59,735 $5,129
77,081
kWh
$796
-
Tgal
$31,627
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs