| Assessment Year | 1995 |
|---|---|
| Principal Product | Toilet Partitions |
| NAICS |
n/a
|
| SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
| Sales Range | $5 M to 10M |
| # of Employees | 92 |
| Plant Area |
60,000
ft2
|
| Annual Production | 132,000
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $32,949 | 499,707 |
kWh
|
$0.066 |
| Natural Gas | $73,915 | 9,189 |
MMBtu
|
$8.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,552 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,127 | $3,978 | n/a |
$2,127
32,239
kWh
|
- | - |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $419 | $1,555 | n/a |
$419
6,448
kWh
|
- | - |
| 03 | 2.4133: Use most efficient type of electric motors | $97 | $412 | n/a |
$97
1,465
kWh
|
- | - |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $447 | $600 | n/a |
$447
5,862
kWh
|
- | - |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $175 | $390 | n/a |
$175
2,638
kWh
|
- | - |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,910 | $300 | n/a |
$1,910
29,015
kWh
|
- | - |
| 07 | 2.8114: Change rate schedules or other changes in utility service | $31,627 | $50,000 | n/a | - | - | $31,627 |
| 08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $750 | $2,500 | n/a |
$(-46.0)
(-586)
kWh
|
$796
-
Tgal
|
- |
| TOTAL RECOMMENDED | $37,552 | $59,735 |
$5,129
77,081
kWh
|
$796
-
Tgal
|
$31,627 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs