ITAC Assessment: HO0102
ITAC logo
ITAC Assessment: HO0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Specialty Chemicals
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 250,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,077 2,990,621
kWh
Natural Gas $336,783 100,464
MMBtu
Fuel Oil #6 $148,390 33,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $194,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $924 $200 $924
8,206
kWh
- -
02 2.4133: Use most efficient type of electric motors $3,470 $3,472 $3,470
30,481
kWh
- -
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $177,106 $600,000 $285,258
2,500,879
kWh
$(-53,114.0)
-
MMBtu
$(-55,038.0)
04 2.1232: Keep boiler tubes clean $12,545 $1,000 - $12,545
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $241 $100 $241
2,052
kWh
- -
TOTAL RECOMMENDED $194,286 $604,772 $289,893
2,541,618
kWh
$(-40,569.0)
-
MMBtu
$(-55,038.0)
TOTAL IMPLEMENTED $13,469 $1,200 $924
8,206
kWh
$12,545
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs