ITAC Assessment: HO0101
ITAC logo
ITAC Assessment: HO0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Point of Purchase Displays
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 110,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,300
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,720 779,015
kWh
Natural Gas $37,617 6,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,251 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,358 $1,285 $1,358
9,379
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $595 $1,174 $595
4,103
kWh
03 2.4133: Use most efficient type of electric motors $273 $688 $273
2,052
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,855 $1,000 $1,855
12,896
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $254 $580 $254
1,758
kWh
06 2.7124: Make a practice of turning off lights when not needed $1,421 $200 $1,421
9,965
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,495 $360 $3,495
24,326
kWh
TOTAL RECOMMENDED $9,251 $5,287 $9,251
64,479
kWh
TOTAL IMPLEMENTED $7,557 $4,399 $7,557
52,462
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs