| Assessment Year | 1994 |
|---|---|
| Principal Product | Flexible Packaging |
| NAICS |
n/a
|
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $5 M to 10M |
| # of Employees | 28 |
| Plant Area |
70,000
ft2
|
| Annual Production | 480,000,000
pieces
|
| Production Hrs. Annual | 2,400
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $77,929 | 602,286 |
kWh
|
$0.13 |
| Natural Gas | $4,795 | 737 |
MMBtu
|
$6.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $3,379 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,302 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,185 | $1,246 |
$1,185
9,086
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $243 | $655 |
$243
1,758
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $93 | $215 |
$93
586
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $64 | $300 |
$64
586
kWh
|
- | |
| 05 | 2.7124: Make a practice of turning off lights when not needed | $265 | - |
$265
2,052
kWh
|
- | |
| 06 | 2.2136: Install / repair insulation on steam lines | $276 | $378 | - |
$276
-
MMBtu
|
|
| 07 | 2.7135: Install occupancy sensors | $441 | $400 |
$441
3,517
kWh
|
- | |
| 08 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $812 | $500 |
$812
6,448
kWh
|
- | |
| TOTAL RECOMMENDED | $3,379 | $3,694 |
$3,103
24,033
kWh
|
$276
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,302 | $3,194 |
$2,026
15,533
kWh
|
$276
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs