ITAC Assessment: HO0094
ITAC logo
ITAC Assessment: HO0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Flexible Packaging
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $5
M
to 10
M
# of Employees 28
Plant Area 70,000
ft2
Annual Production 480,000,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,929 602,286
kWh
Natural Gas $4,795 737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,302

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,185 $1,246 $1,185
9,086
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $243 $655 $243
1,758
kWh
-
03 2.4133: Use most efficient type of electric motors $93 $215 $93
586
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $64 $300 $64
586
kWh
-
05 2.7124: Make a practice of turning off lights when not needed $265 - $265
2,052
kWh
-
06 2.2136: Install / repair insulation on steam lines $276 $378 - $276
-
MMBtu
07 2.7135: Install occupancy sensors $441 $400 $441
3,517
kWh
-
08 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $812 $500 $812
6,448
kWh
-
TOTAL RECOMMENDED $3,379 $3,694 $3,103
24,033
kWh
$276
-
MMBtu
TOTAL IMPLEMENTED $2,302 $3,194 $2,026
15,533
kWh
$276
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs