ITAC Assessment: MS0065
ITAC logo
ITAC Assessment: MS0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product household lamps
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 100,940
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,880 686,987
kWh
Electricity Fees $(-2,648.0) -
Natural Gas $40,220 8,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $269 - $303
7,034
kWh
$(-34.0) - - - - -
02 2.7111: Reduce illumination to minimum necessary levels $699 $441 $787
18,171
kWh
$(-88.0) - - - - -
03 2.2437: Recover waste heat from equipment $2,380 $4,484 - - $2,230
-
MMBtu
$75
-
Tgal
- - $75
-
Tgal
04 2.2437: Recover waste heat from equipment $2,297 $2,580 - - $2,297
-
MMBtu
- - - -
05 3.7196: Use re-usable filters $270 $450 - - - - - $270 -
06 3.5311: Recover and reuse waste material $7,000 $20,494 - - - - $7,000
-
lb
- -
TOTAL RECOMMENDED $12,915 $28,449 $1,090
25,205
kWh
$(-122.0) $4,527
-
MMBtu
$75
-
Tgal
$7,000
-
lb
$270 $75
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs