ITAC Assessment: UM0067
ITAC logo
ITAC Assessment: UM0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printing and Binding
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 73
Plant Area 8,472
ft2
Annual Production 180,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,067 931,419
kWh
Natural Gas $7,226 1,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,571

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $546 $482 $546
5,569
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,025 $9,549 $6,025
46,307
kWh
- -
03 2.7221: Lower temperature during the winter season and vice-versa $607 $350 $607
5,862
kWh
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $1,413 $6,860 - $1,413
-
MMBtu
-
05 3.7121: Improve handling practices $2,600 $400 - - $2,600
TOTAL RECOMMENDED $11,191 $17,641 $7,178
57,738
kWh
$1,413
-
MMBtu
$2,600
TOTAL IMPLEMENTED $6,571 $10,031 $6,571
51,876
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs