Assessment Year | 1991 |
---|---|
Principal Product | PISTON RINGS |
NAICS |
n/a
|
SIC | 3592: Carburetors, Pistons, Piston Rings, and Valves |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
n/a
|
Annual Production | 24,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $940,231 | 16,470,106 |
kWh
|
$0.057 |
Natural Gas | $202,252 | 44,309 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,215 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,215 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $32,787 | $25,340 | - |
$32,787
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,459 | $1,815 |
$15,459
270,809
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $2,105 | $3,600 |
$2,105
36,928
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,483 | $2,799 |
$1,483
26,084
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,238 | - |
$8,238
144,197
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,510 | $1,295 | - |
$2,510
-
MMBtu
|
|
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,633 | $678 | - |
$1,633
-
MMBtu
|
|
TOTAL RECOMMENDED | $64,215 | $35,527 |
$27,285
478,018
kWh
|
$36,930
-
MMBtu
|
||
TOTAL IMPLEMENTED | $64,215 | $35,527 |
$27,285
478,018
kWh
|
$36,930
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs