ITAC Assessment: MO0030
ITAC logo
ITAC Assessment: MO0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PISTON RINGS
NAICS
n/a
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 24,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $940,231 16,470,106
kWh
Natural Gas $202,252 44,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8113: Purchase gas directly from a contract gas supplier $32,787 $25,340 - $32,787
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,459 $1,815 $15,459
270,809
kWh
-
03 2.4133: Use most efficient type of electric motors $2,105 $3,600 $2,105
36,928
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,483 $2,799 $1,483
26,084
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,238 - $8,238
144,197
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,510 $1,295 - $2,510
-
MMBtu
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,633 $678 - $1,633
-
MMBtu
TOTAL RECOMMENDED $64,215 $35,527 $27,285
478,018
kWh
$36,930
-
MMBtu
TOTAL IMPLEMENTED $64,215 $35,527 $27,285
478,018
kWh
$36,930
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs