ITAC Assessment: IA0560
ITAC logo
ITAC Assessment: IA0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Machined Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 100,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,550 2,797,200
kWh
Electricity Demand $73,518 6,526
kW-mo/yr
Electricity Fees $2,930 -
Natural Gas $6,895 1,664
MMBtu
TOTAL YEARLY COSTS $228,893
RECOMMENDED SAVINGS* $8,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,818 $1,011 $2,913
56,028
kWh
$905
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,092 $200 $2,359
45,360
kWh
$733
-
kW-mo/yr
03 2.7135: Install occupancy sensors $1,223 $1,200 $1,223
23,498
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $819 $1,000 $625
12,012
kWh
$194
-
kW-mo/yr
TOTAL RECOMMENDED $8,952 $3,411 $7,120
136,898
kWh
$1,832
-
kW-mo/yr
TOTAL IMPLEMENTED $7,729 $2,211 $5,897
113,400
kWh
$1,832
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs