ITAC Assessment: HO0091
ITAC logo
ITAC Assessment: HO0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Coating of Metals with Plastics
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,750
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,843 1,182,298
kWh
Natural Gas $129,571 24,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,509

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,017 $1,493 $1,017
9,672
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $289 $1,093 $289
2,638
kWh
-
03 2.4133: Use most efficient type of electric motors $203 $483 $203
2,052
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,045 $400 $1,045
9,672
kWh
-
05 2.2511: Insulate bare equipment $2,042 $6,430 - $2,042
-
MMBtu
TOTAL RECOMMENDED $4,596 $9,899 $2,554
24,034
kWh
$2,042
-
MMBtu
TOTAL IMPLEMENTED $1,509 $3,069 $1,509
14,362
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs