ITAC Assessment: CL2002
ITAC logo
ITAC Assessment: CL2002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated waste water
NAICS 562219: Other Nonhazardous Waste Treatment and Disposal
SIC 4953: Refuse Systems
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 250,000
ft2
Annual Production 5,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $502,755 10,316,495
kWh
Electricity Demand $218,445 20,393
kW-mo/yr
Electricity Fees $1,126 -
Natural Gas $4,940 5,723
MMBtu
Waste Disposal Costs
Water Usage $1,935 33
Tgal
Water Disposal $1 33
Tgal
TOTAL YEARLY COSTS $729,202
RECOMMENDED SAVINGS* $126,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,753 $16,667 $3,195
65,207
kWh
$3,558
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $70,362 $136,200 $54,149
1,105,074
kWh
$16,213
-
kW-mo/yr
03 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $49,183 $300,000 $37,850
772,453
kWh
$11,333
-
kW-mo/yr
TOTAL RECOMMENDED $126,298 $452,867 $95,194
1,942,734
kWh
$31,104
-
kW-mo/yr
TOTAL IMPLEMENTED $126,298 $452,867 $95,194
1,942,734
kWh
$31,104
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs