ITAC Assessment: HO0090
ITAC logo
ITAC Assessment: HO0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 78,000
ft2
Annual Production 180,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $530,525 6,646,835
kWh
Natural Gas $31,975 5,741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,802 $2,384 $2,802
35,170
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,740 $3,662 $1,740
21,981
kWh
-
03 2.4133: Use most efficient type of electric motors $1,947 $2,647 $1,947
24,619
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $4,165 $1,000 $4,165
52,462
kWh
-
05 2.8113: Purchase gas directly from a contract gas supplier $4,796 $2,000 - $4,796
06 2.2511: Insulate bare equipment $936 $400 $936
4,689
kWh
-
TOTAL RECOMMENDED $16,386 $12,093 $11,590
138,921
kWh
$4,796
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs