ITAC Assessment: HO0088
ITAC logo
ITAC Assessment: HO0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 111,000
ft2
Annual Production 9,700,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,870,366 24,406,214
kWh
Natural Gas $65,682 11,930
MMBtu
Fuel Oil #4 $37,781 9,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,778 $3,600 $10,778
140,680
kWh
-
02 2.4314: Use synthetic lubricant $35,420 - $35,420
460,141
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,417 $440 $1,417
18,464
kWh
-
04 2.4133: Use most efficient type of electric motors $4,427 $7,933 $4,427
57,444
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $9,116 $1,200 $9,116
118,406
kWh
-
06 2.8113: Purchase gas directly from a contract gas supplier $9,852 $2,000 - $9,852
07 2.3212: Optimize plant power factor $7,790 $37,200 $7,790
-
kWh
-
TOTAL RECOMMENDED $78,800 $52,373 $68,948
795,135
kWh
$9,852
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs