ITAC Assessment: HO0083
ITAC logo
ITAC Assessment: HO0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Sheet Metal Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,588
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,263 381,008
kWh
Natural Gas $22,427 4,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,879 $3,712 $3,879
30,481
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $700 $1,600 $700
5,569
kWh
-
03 2.4133: Use most efficient type of electric motors $304 $710 $304
2,345
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $810 $500 $810
6,448
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $918 $740 $918
7,327
kWh
-
06 2.7124: Make a practice of turning off lights when not needed $3,568 $600 $1,428
11,137
kWh
$2,140
-
MMBtu
TOTAL RECOMMENDED $10,179 $7,862 $8,039
63,307
kWh
$2,140
-
MMBtu
TOTAL IMPLEMENTED $8,147 $5,912 $6,007
47,187
kWh
$2,140
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs