ITAC Assessment: TT0054
ITAC logo
ITAC Assessment: TT0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Air Compressors
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3563: Air and Gas Compressors
Sales Range $100
M
to 500
M
# of Employees 328
Plant Area 466,100
ft2
Annual Production 570,868
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $427,205 8,790,697
kWh
Electricity Demand $382,451 30,988
kW-mo/yr
Natural Gas $193,400 1,910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $251,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $251,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $204,750 $50,000 $77,900
623,600
kWh
- $126,850
-
MMBtu
02 2.2443: Re-use or recycle hot or cold process exhaust air $23,040 $10,000 - - $23,040
-
MMBtu
03 2.3212: Optimize plant power factor $18,350 $20,000 - $18,350
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,700 $4,500 $3,700
124,350
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,240 $4,000 $680
22,900
kWh
$560
-
kW-mo/yr
-
06 2.6211: Conserve energy by efficient use of vending machines $410 $50 $260
8,890
kWh
$150
-
kW-mo/yr
-
TOTAL RECOMMENDED $251,490 $88,550 $82,540
779,740
kWh
$19,060
-
kW-mo/yr
$149,890
-
MMBtu
TOTAL IMPLEMENTED $251,490 $88,550 $82,540
779,740
kWh
$19,060
-
kW-mo/yr
$149,890
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs