Assessment Year | 2010 |
---|---|
Principal Product | Air Compressors |
NAICS | 333912: Air and Gas Compressor Manufacturing |
SIC | 3563: Air and Gas Compressors |
Sales Range | $100 M to 500M |
# of Employees | 328 |
Plant Area |
466,100
ft2
|
Annual Production | 570,868
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $427,205 | 8,790,697 |
kWh
|
$0.049 |
Electricity Demand | $382,451 | 30,988 |
kW-mo/yr
|
$12.34 |
Natural Gas | $193,400 | 1,910 |
MMBtu
|
$101.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $251,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $251,490 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $204,750 | $50,000 |
$77,900
623,600
kWh
|
- |
$126,850
-
MMBtu
|
|
02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $23,040 | $10,000 | - | - |
$23,040
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $18,350 | $20,000 | - |
$18,350
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,700 | $4,500 |
$3,700
124,350
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,240 | $4,000 |
$680
22,900
kWh
|
$560
-
kW-mo/yr
|
- | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $410 | $50 |
$260
8,890
kWh
|
$150
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $251,490 | $88,550 |
$82,540
779,740
kWh
|
$19,060
-
kW-mo/yr
|
$149,890
-
MMBtu
|
||
TOTAL IMPLEMENTED | $251,490 | $88,550 |
$82,540
779,740
kWh
|
$19,060
-
kW-mo/yr
|
$149,890
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs